Author's department:
Project Status:
In the 1960s – 1970s, Lengiprotrans prepared projects for highways in the Leningrad Region by order of the USSR Ministry of Agriculture.
A major overhaul of the existing roads was planned with reconstruction in certain sections:
• Pulkovo - Vanakyula (15 km);
• Zalesye - Porechye (30 km);
• Vispory - Novoselye (10 km);
• Ovtsino - Plant im. Sverdlov (15 km).