Completed projects

950
projects completed

Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.

Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.

The page shows the objects of the selected type, the design of which was performed in the selected period
  • 1990 — 1999
Расширение производственной базы СУ-426 треста «Балтморгидрострой» в Лиепае
Trust "Baltmorgidrostroy" was established in 1952 with the aim of restoring damaged sea and commercial ports, ship repair companies in the Baltic region. In the cities of the Baltic coast (...
  • 1960 — 1969
Генеральная схема развития Ленинградского узла на 1980–1985 годы
Since the middle of the last century, Lengiprotrans has been developing a general scheme for the development of the St. Petersburg (formerly Leningrad) railway junction. In the 1960-1970s, the...
  • 1940 — 1949
  • 1970 — 1979
Радвилишкский железнодорожный узел
In 1940-1950s "Lengiprotans" was engaged in the restoration of the railway infrastructure destroyed during the Great Patriotic War. During this period, the institute developed a general scheme and...
  • 1990 — 1999
Электрификация участка Чудово — Новгород
In the 1990s, Lengiprotrans developed a project for the electrification of the single-track section Chudovo - Novgorod (since 1999 - Veliky Novgorod) of the Oktyabrskaya Railway. Here, for the...
  • 1950 — 1959
  • 1960 — 1969
Электрификация участка Ленинград — Пери — Васкелово
Railway line Leningrad (now St. Petersburg) - Peri - Vaskelovo - a section of the Priozersky direction of the Oktyabrskaya railway. In the 1950s, Lengiprotrans developed a project for the...
Pages