In the 1980s, Lengiprotrans developed a project for the modernization of electrical interlocking at Ugolnaya station in the Kaliningrad region. The operational part of signaling and communication...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
Škirotava is a railway station on the Riga - Daugavpils line of the Latvian Railway.
In 1976, according to the Lengiprotrans project, a rest house for locomotive crews with 96 sleeping places...
Since the middle of the last century, Lengiprotrans has been developing a general scheme for the development of the St. Petersburg (formerly Leningrad) railway junction. In the 1960-1970s, the...
In 1940-1950s "Lengiprotans" was engaged in the restoration of the railway infrastructure destroyed during the Great Patriotic War. During this period, the institute developed a general scheme and...
In the 1990s, Lengiprotrans developed a project for the electrification of the single-track section Chudovo - Novgorod (since 1999 - Veliky Novgorod) of the Oktyabrskaya Railway. Here, for the...
Pages