In 1940-1950s "Lengiprotans" was engaged in the restoration of the railway infrastructure destroyed during the Great Patriotic War. During this period, the institute developed a general scheme and...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
In the 1990s, Lengiprotrans developed a project for the electrification of the single-track section Chudovo - Novgorod (since 1999 - Veliky Novgorod) of the Oktyabrskaya Railway. Here, for the...
Railway line Leningrad (now St. Petersburg) - Peri - Vaskelovo - a section of the Priozersky direction of the Oktyabrskaya railway.
In the 1950s, Lengiprotrans developed a project for the...
Rybatskoye - Kupchinskaya is a section of the Southern Semicircle (also called the Second Port Branch) of the St. Petersburg railway junction, opened in 1930.
In the 1970s-1980s, according to...
In 1950-1970, the former Department of Lengiprotrans Plants participated in the design of facilities related to the post-war reconstruction of the railway industry, the development of production...
In the 2010s, Lengiprotrans developed a project for a road overpass on the Tammisuo - Gvardeyskoye section of the Vyborg-Kamenogorsk railway section to replace three closed crossings in the...
Pages