In the 2000s, Lengiprotrans developed a project for the reconstruction of a city-wide highway of continuous traffic on the section from the intersection of Krasniy Znameni Avenue and Nekrasovskaya...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
At the turn of the 20th – 21st centuries, Russia began to actively introduce high-speed traffic into the railway network. Lengiprotrans has developed a project for organizing high-speed passenger...
The Bui - Vologda railway line is part of the Northern Railway. In the early 2000s, Lengiprotrans developed a project for second tracks on the site in order to increase the throughput of the East-...
For the first time PJSC Lengiprotrans began to consider the development of railway approaches to the port of Ust-Luga in 1992, when he took part in the development of the General Scheme for the...
In the early 2000s, Lengiprotrans developed a project for the electrification of intra-nodal connecting lines of the Saint-Petersburg railway hub in order to ensure the passage of routes to the...
In 2011, the Ust-Luga Company established that by 2013–2014 the port's freight through the railway component is planned to be within 60 million tons.
In this connection, the construction of a...
Pages