In the 2000s, Lengiprotrans developed a project for the reconstruction of a city-wide highway of continuous traffic on the section from the intersection of Krasniy Znameni Avenue and Nekrasovskaya...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
The Bui - Vologda railway line is part of the Northern Railway. In the early 2000s, Lengiprotrans developed a project for second tracks on the site in order to increase the throughput of the East-...
At the turn of the 20th – 21st centuries, Russia began to actively introduce high-speed traffic into the railway network. Lengiprotrans has developed a project for organizing high-speed passenger...
In the early 2000s, Lengiprotrans developed a project for the reconstruction of the St. Petersburg railway junction with electrification and the development of intra-nodal lines.
The extension...
Development of technical solutions for servicing the liquid cargo complex and passing the transit flow in the direction of Luzhskaya-General station and for the further development of the...
JSC Lengiprotrans since 2002 has been the general contractor for the design of the infrastructure development of the Ust-Luga railway hub.
Luzhskaya-Sortirovochnaya is the only innovative...