In the post-war years, Lentransproekt's Bridges Department (since 1951 - Lengiprotrans) was engaged not only in the restoration of destroyed objects in the Baltic republics, but also in the design...
In the post-war years, Lentransproekt's Bridges Department (since 1951 - Lengiprotrans) was engaged not only in the restoration of destroyed objects in the Baltic republics, but also in the design...
After the blockade of Leningrad was lifted, a group of specialists from Lentransproekt (since 1951 - Lengiprotrans) was engaged in the restoration of the destroyed transport infrastructure...
After the blockade of Leningrad was lifted, a group of specialists from Lentransproekt (since 1951 - Lengiprotrans) was engaged in designing the restoration of the destroyed transport...
In 1981, Lengiprotrans developed a project for the reconstruction of a bridge over the Tovarny stream in 1981 as part of the track reconstruction of the Kaliningrad-Sortirovochny station.
In the 1950s, Lengiprotrans developed a project for the overhaul of the bridge over the Pissa River at 912 km of the Virbalis - Kaliningrad section of the Lithuanian Railway.